Getting Started
We finally received the okay to get going on cleaning up The Grove. What is The Grove? Right now it is a 800ish sqft space with a cement floor with a hole in it, a bathroom with no toilet and a couple of tapestries in the window, thats it. The electricity is turned on but still no heat.
The website has been launched, but we are still waiting for a final logo and a lot of content.
To Do List:
- Get the heat turned on
- Frame out window, insulate, sheetrock
- Cut and add sliding glass door to Bohemian High
- Build wall with interior door separating event space from back room
- Put down plywood on back floor and bathroom
- Reseat the toilet
- Prep all walls for paint
- Prep all ceiling for paint
- Prep floor for paint
- Paint ceiling
- Paint walls
- Paint floor
- Decide how to partition front of space from event space
- Replace lock set on rear door
- Start scheduling events
- Shop for furnature and fixtures
List of stuff to get:
- 5 sheets of plywood, 1/2 inch
- 7 sheets of sheetrock, 1/2 inch
- 15 2x4s
- 4 bags of 45 minute durabond spackle
- 4 metal corners, 8 ft
- 1 interior prehung door
- Floor paint
- Wall paint
- Painting supplies
- Pink insulation
- Bathroom flooring
- Toilet wax seat ring
- Extior door knob set, preferably leaver style with secondary lock
- 3 additional sets of key
- Sliding glass door